Local Plan Issues and Options (Regulation 18)

Search representations

Results for Anwyl Construction search

New search New search

Comment

Local Plan Issues and Options (Regulation 18)

Question SS 5

Representation ID: 10042

Received: 27/08/2025

Respondent: Anwyl Construction

Agent: Hourigan Planning

Representation Summary:

I&O_10539
It is agreed that Helsby has a level of facilities and services that means it can meet the day -to-day needs of existing and new residents and those living in surrounding areas.

Comment

Local Plan Issues and Options (Regulation 18)

Question SS 9

Representation ID: 10043

Received: 27/08/2025

Respondent: Anwyl Construction

Agent: Hourigan Planning

Representation Summary:

I&O_10540
It is considered that circumstances (most notably the increase in housing needs through the revised standard method) now justify Green Belt release.

Comment

Local Plan Issues and Options (Regulation 18)

Question SS 44

Representation ID: 10044

Received: 27/08/2025

Respondent: Anwyl Construction

Agent: Hourigan Planning

Representation Summary:

I&O_10541
The site the subject of this submission is located within the HEL01 housing growth option as identified in Map 5.11 of the consultation document and is supported as a housing allocations by our client (refer to individual site submission enclosed).

For instructions on how to use the system and make comments, please see our help guide.